
Div 32 · Exterior Improvements
Parking lot maintenance and striping
Faded striping is not cosmetic. Illegible fire lanes, unmarked accessible spaces and worn directional arrows are the exterior items most likely to turn into a citation or a claim, and they degrade so gradually that nobody notices until an inspector does.
We maintain and restripe commercial parking lots and apartment complex lots — pavement and concrete repair, seal coating, sweeping, pressure washing, and fresh line and marking layout for traffic flow.
Accessible parking is the part worth being specific about. Space count, van-accessible provision, access aisle marking and signage are set by requirement rather than by preference, and a lot that was compliant when it was built may not be after a restripe that changed the layout.
What is in scope
- Line striping and full restripe layout
- Fire lane marking and curb painting
- Accessible space marking, access aisles and signage
- Directional arrows, stop bars and crosswalks
- Asphalt and concrete repair, patching, crack sealing
- Seal coating
- Lot sweeping and pressure washing
- Wheel stop, bollard and signage replacement
When people call us
- Striping has faded to where drivers are making their own lanes
- Fire lane marking is no longer legible
- An inspection flagged accessible parking
- Potholes or alligator cracking are spreading across a drive lane
None of these describe your situation? Describe it in your own words instead. The quote form routes by property type and scope, not by which page you landed on.
Describe the buildingQuestions we actually get asked
How often does a commercial parking lot need restriping?
Most commercial lots need restriping every 18 to 36 months on the Gulf Coast, driven by traffic volume, sun exposure and whether the surface was sealed. Fire lanes and accessible markings usually need it sooner because legibility is the requirement.
Can you restripe without closing the whole lot?
Yes. Restriping is normally phased by section or run overnight so the property stays operational. Paint cure time drives the closure window more than the striping does.
Div 32 · Grounds Keeping
Also under grounds keeping
Coverage
Parking Lot Maintenance & Striping across greater Houston
- Houston
- Dallas
- Fort Worth
- Arlington
- Plano
- Irving
- Garland
- Frisco
- McKinney
- Grand Prairie
- Denton
- Mesquite
- Pasadena
- Lewisville
- Carrollton
- Pearland
- College Station
- League City
- Richardson
- Conroe
- The Woodlands
- Allen
- Sugar Land
- Bryan
- Atascocita
- Baytown
- Mansfield
- Flower Mound
- Missouri City
- North Richland Hills
- Rowlett
- Wylie
- Spring
- Little Elm
- Euless
- Texas City
- DeSoto
- Burleson
- Fulshear
- Rockwall
- Galveston
- Celina
- Grapevine
- Sherman

Next step
Tired of poorly maintained facilities?
That was the best line on the old website and it sat halfway down the homepage under a generic button. Tell us what building you are running and what is not getting done.